The control strategy is part of the heating system.

Electric floor heating works best when each heated zone has controls that match the room use, floor finish and desired operating schedule.

Thermostats, floor sensors and Wi-Fi control can help pre-warm rooms, manage floor temperature and avoid unnecessary operation.

Electric underfloor heating thermostat and floor sensor controls
Thermostats and floor sensors help manage comfort, timing and floor temperature limits.
Electric underfloor heating adjusted from a smartphone app
Wi-Fi thermostat control can let users adjust electric floor heating schedules and temperatures from a smartphone.

Control video

Explore electric floor heating thermostat features.

See how the Wi-Fi room thermostat can support convenient control of electric floor heating.

SmartHeat Room Thermostat with Wi Fi

Smartheat Thermorstat - It's convenient to control your thermostat with your voice and it allows you control by mobile app anytime or anywhere you are.

Control options

Controls turn electric floor heating into a room-by-room system.

Thermostats and controls make electric floor heating usable by managing schedules, floor temperature and room-by-room operation.

Schedule

Heat rooms when needed

Programmable schedules can pre-warm bathrooms, kitchens or bedrooms around daily routines.

Sensor

Manage floor temperature

Floor sensors help protect finishes and maintain comfortable surface temperatures.

Wi-Fi

App and voice control

Wi-Fi enabled thermostats can support mobile app control and compatible voice control.

Zones

Room-by-room comfort

Separate controls allow rooms to operate around their own use patterns.

Project flow

Planned room by room before installation.

Control planning should happen before installation so sensor routing, thermostat location and electrical provision are resolved.

  1. 01

    Confirm the room and finish

    Review the heated area, floor finish, floor build-up and project stage.

  2. 02

    Select the heating layer

    Match the electric heating product to the usable floor area and installation method.

  3. 03

    Coordinate controls

    Plan thermostat position, floor sensor routing and electrical connection requirements.

  4. 04

    Install and test

    Install below the finished floor system and complete electrical testing before handover.

Technical planning

Controls protect comfort, finishes and running time.

Thermostat location, floor sensor position, electrical wiring and floor temperature limits should be planned before finishes are installed.

Thermostat location
Controls should be accessible and suited to the room layout and electrical plan.
Floor sensor
Sensor placement helps measure floor temperature accurately and protect floor finishes.
Scheduling
Seven-day programming can reduce unnecessary operation and improve comfort timing.
Wi-Fi control
Connected thermostats can support app-based control and convenient adjustment.

Best suited to

Where control selection matters.

  • Bathrooms needing morning warm-up
  • Kitchens and laundries with timed operation
  • Bedrooms and living rooms with separate schedules
  • Tile, stone, timber and laminate floor control
  • Wi-Fi enabled thermostat upgrades
  • Multi-zone electric floor heating projects

FAQ

Common thermostats & controls questions.

Does electric floor heating need a thermostat?

Yes. Electric floor heating is normally controlled by a thermostat, often with a floor sensor for surface temperature management.

Can thermostats be Wi-Fi enabled?

Yes. Wi-Fi thermostat options can support app control, schedules and compatible voice control.

Can different rooms have different schedules?

Yes. Separate zones can be controlled independently when each room has its own thermostat or control arrangement.

Control brands

Control and thermostat brands for selected systems.

Thermosoft control options can be matched to the heating type, room use, sensor requirements and preferred schedule.

Plan the floor build-up

Need thermostats selected for electric floor heating?

Share the room size, floor finish and project stage so the electric heating pathway can be reviewed.

Need full delivery support?

Review SmartHeat's design, supply and installation service for complete project coordination.

Design, Supply & Installation

Send your details.